Home \ International \ Herrenknecht presents tunnel boring machine for Vienna
Herrenknecht presents tunnel boring machine for Vienna
08/02/2024
Pubblicato da Ettore Zanatta
Herrenknecht is supplying a tunnel boring machine for tunnel construction under the city center.
On behalf of Wiener Linien, the operator of the Vienna subway, a joint venture between Strabag and Porr is building the extension of subway line 2 from Vienna City Hall to the south.
The Austrian tunnel construction specialists ordered an EPB Shield (Earth Pressure Balance Shield) tunnel boring machine from Herrenknecht for this project. Ralph Lickert, Project Manager at Herrenknecht, emphasizes: "The Herrenknecht EPB Shield is the optimal machine type for the predominantly clayey geology that we expect according to the preliminary investigations." The Herrenknecht EPB Shield for the Austrian capital has a diameter of 6,840 millimetres, a length of around 120 meters and weighs a total of around 1,200 tons. The drive will start at the future Matzleinsdorfer Platz station, from where the machine will drive 2.1 kilometers of tunnel northwards to below Augustinplatz. The machine will then be pulled back through the bored tunnel, which is lined with precast concrete segments, in order to drive the parallel tube from Matzleinsdorfer Platz.
With the expansion of the metro network, the city of Vienna is responding to a rising population. More than two million people are expected to live in the capital by 2030. According to the city, the investment in the line extensions will create and secure around 30,000 jobs. Construction companies worldwide have already bored over 3,000 kilometers of tunnels for high-performance metro systems in more than 1,300 projects using Herrenknecht's mechanized tunnelling technology. Current flagship projects include the major Grand Paris Express and Sydney Metro projects with 22 and 15 Herrenknecht machines respectively.
Ultime notizie di Herrenknecht
Perforation
18/09/2024
Herrenknecht returns to the Gotthard
Mechanized tunnelling technology from Schwanau is once again...
Perforation
15/05/2024
Second wind farm with Herrenknecht OFD technology
Herrenknecht's Offshore Foundation Drilling (OFD) technology...
Perforation
18/03/2024
Herrenknecht: eight tunnel boring machines for the Brenner project
Seventh tunnel boring machine handed over for the record-bre...
03/05/2021
Advance record at the Brenner Base Tunnel
The miners in the Brenner Base Tunnel are pushing ahead rapi...
23/07/2020
Mighty breakthrough for Europe's biggest boring machine
Following the specifications of customer Pavimental, Herrenk...
17/01/2020
Herrenknecht: Suse, Sibylle, Wanda and Käthchen from Baden set a fast pace in Swabia
Mechanized tunnelling technology for efficient and environme...
Altri International
International
21/11/2024
Kleemann: New compact crusher used for recycling
Impact crusher MOBIREX MR 100i NEO impresses during operatio...
International
21/11/2024
SITECH partners with Royal Engineers to create poppy and demonstrate tech offering
The demostration involved creating a ground-level poppy desi...
International
20/11/2024
Strong and stable RA30 trucks carry the weight at New Caledonian mine
Three Rokbak RA30 trucks are delivering exceptional durabili...
International
20/11/2024
Tadano AC 7.450-1 Performs Double Duty in Wisconsin
A cost-saving and versatile solution was already on site - a...
International
19/11/2024
Liebherr Tower Cranes and John Paul Construction celebrate 50 years of partnership
Irish construction company John Paul Construction is celebra...
International
18/11/2024
The CMC i23 aerial platform: an example of high performances
CMC i23 is designed to maximise operational efficiency in al...