In Awe of the Volcano: drilling in the Shadow of the Nevado del Tolima
10/10/2019
Pubblicato da Redazione
Drilling rig Liebherr LB 36 convinces with good performance
The Colombian government’s “4G Toll Road Concession Program” is the largest project in Latin America for the development of the road infrastructure. It involves the expansion or maintenance of about 7000 km of roads as well as the erection of new bridges. On the east-west route from Ibagué to Cajamarca, the company Mincivil S.A. is relying on the drilling rig LB 36 from Liebherr. The alternative is significantly more laborious.
One section of the large-scale construction project is in the Andes in West Colombia. In direct proximity: the Nevado del Tolima, beside the Nevado del Ruiz and the Nevado de Santa Isabel, one of the three largest volcanoes in the “Parque Nacional Natural Los Nevados”. A two-lane road is being built on the 35 km long route between Ibagué and Cajamarca and will include 40 bridges made of concrete elements. It is assumed the distance can then be covered in half the time that is currently required.
The contractor for the project is APP GICA S.A., a group of six Colombian construction companies. One of them, Mincivil, is applying the drilling rig type LB 36 from Liebherr for the installation of the bridge piles in Ibagué. Using the Kelly drilling method, the machine is installing piles with diameters of 1500 mm and average depths of 30 m. The number of piles varies according to the design of the bridge. Depending on the soil conditions, the LB 36 has a daily performance of 10 to 15 m drilling depth.
The proximity of the Nevado del Tolima is clearly noticeable on the job site. Due to the close vicinity of the volcano, the soil consists of a hard rock layer and is extremely difficult to crack. A task which is a little too ambitious for many drilling rigs. It would seem they bow in awe of the 5220 m high volcano. Daniel Rodriguez, Foundation Unit Business Manager at Mincivil, has already applied diverse deep foundation equipment. Thanks to his many years of experience, he is sure of one thing, “Only Liebherr comes into consideration with such hard soil conditions.”
Man v. Machine
Not only is the Kelly drilling a challenge for man and machine. In consideration of the partially extremely rough terrain, it is in itself a remarkable feat that Mincivil ever managed to transport the LB 36 to the job site. It’s not possible everywhere or the costs involved would be disproportionately high. The only alternative: install the piles laboriously and with a great deal of hard work by hand. This physical effort is also required in Ibagué. With tremendous effort the workers achieve 1.5 m per day. Of course, the comparison between them and an LB 36, with a daily performance which is ten times higher, is not fair. It shows, however, just how important reliable and high performance machines are for the completion of such large-scale projects. Daniel is pleased that Mincivil is reaching a high level of productivity through the good performance of the LB 36.
The go-ahead for the construction project was in April 2016. According to plan, completion should be in 2024. An investment of COP 1,810,392,000,000 (~EUR 528 million) is being made for the realization
![](/storage/aziende/14852496638096.jpg)
Ultime notizie di Liebherr EM-Tec Italia
![100,000th machine: Liebherr sets milestone on its 75th anniversary](/storage/2024/07/100000th-machine-liebherr-sets-milestone-on-its-75th-anniversary-66a4882ac8547.jpg)
Earthmoving Machinery
29/07/2024
100,000th machine: Liebherr sets milestone on its 75th anniversary
It is another milestone in the historyLiebherr-Hydraulikbagg...
![First large Liebherr wheel loader with hydrogen engine and first hydrogen filling station in Salzburg](/storage/2024/07/first-large-liebherr-wheel-loader-with-hydrogen-engine-and-first-hydrogen-filling-station-in-salzburg-6688f59871f7a.jpg)
Earthmoving Machinery
17/07/2024
First large Liebherr wheel loader with hydrogen engine and first hydrogen filling station in Salzburg
World's first prototype large wheel loader with hydrogen eng...
![Liebherr's XPower wheel loaders are ideal for handling sand and gravel](/storage/2024/06/liebherrs-xpower-wheel-loaders-are-ideal-for-handling-sand-and-gravel-668115fe30a33.jpg)
Earthmoving Machinery
11/07/2024
Liebherr's XPower wheel loaders are ideal for handling sand and gravel
Liebherr's XPower wheel loaders and their smart machine conc...
![Kurt Motz expands its fleet with seven new Liebherr machines](/storage/2024/06/kurt-motz-expands-its-fleet-with-seven-new-liebherr-machines-66810e3e3d8b3.jpg)
Perforation
05/07/2024
Kurt Motz expands its fleet with seven new Liebherr machines
The company Kurt Motz expands its fleet with seven new Liebh...
![Eti Maden opts for Liebherr Crawler Dozers](/storage/2024/06/eti-maden-opts-for-liebherr-crawler-dozers-665defcac88a8.jpg)
Earthmoving Machinery
07/06/2024
Eti Maden opts for Liebherr Crawler Dozers
Industry leader Eti Maden confirms lower fuel consumption th...
![LRB 23 continues the success story of piling and drilling rigs for Liebherr](/storage/2024/05/lrb-23-continues-the-success-story-of-piling-and-drilling-rigs-for-liebherr-66485fc11a92e.jpg)
Perforation
03/06/2024
LRB 23 continues the success story of piling and drilling rigs for Liebherr
The piling and drilling rig type LRB 23 closes the gap betwe...
Altri International
![100,000th machine: Liebherr sets milestone on its 75th anniversary](/storage/2024/07/100000th-machine-liebherr-sets-milestone-on-its-75th-anniversary-66a4882ac8547.jpg)
International
29/07/2024
100,000th machine: Liebherr sets milestone on its 75th anniversary
It is another milestone in the historyLiebherr-Hydraulikbagg...
![KönningKrane takes delivery of Liebherr LTM 1160-5.2](/storage/2024/07/konningkrane-takes-delivery-of-liebherr-ltm-1160-52-669f9a5f379f9.jpg)
International
29/07/2024
KönningKrane takes delivery of Liebherr LTM 1160-5.2
KönningKrane GmbH & Co KG from Stadtlohn in the north-west o...
![Exclusive new Cat Track Wear Sensor](/storage/2024/07/exclusive-new-cat-track-wear-sensor-669f9e20ae70c.jpg)
International
26/07/2024
Exclusive new Cat Track Wear Sensor
Exclusive new Cat Track Wear Sensor provides remote, no-touc...
![Tamás és Zsolt Kft. took delivery of Liebherr LTM 1650-8.1](/storage/2024/07/tamas-es-zsolt-kft-took-delivery-of-liebherr-ltm-1650-81-6688f18bdc18d.jpg)
International
26/07/2024
Tamás és Zsolt Kft. took delivery of Liebherr LTM 1650-8.1
Tamás és Zsolt Kft. has added a Liebherr LTM 1650-8.1 to its...
![Cummins opens new powertrain test facility](/storage/2024/07/cummins-opens-new-powertrain-test-facility-669f9c6a4b904.jpg)
International
25/07/2024
Cummins opens new powertrain test facility
Cummins has opened a new powertrain test facility to support...
![Grove GMK6300L-1 proves perfect for compact jobsite in Rotterdam](/storage/2024/07/grove-gmk6300l-1-proves-perfect-for-compact-jobsite-in-rotterdam-6683b901e94d4.jpg)
International
25/07/2024
Grove GMK6300L-1 proves perfect for compact jobsite in Rotterdam
Kraanverhuur Boekestijn sent its Grove GMK6300L-1 for city c...