Home \ International \ Liebherr-France SAS invests 5 million Euro in new assembly line
Liebherr-France SAS invests 5 million Euro in new assembly line
25/03/2019
Pubblicato da Redazione
![/storage/old/nc6000828/15530679877781.jpeg](/storage/old/nc6000828/15530679877781.jpeg)
Liebherr-France SAS in Colmar has put a new assembly line into operation. It is based on the principles of lean management, and will thus contribute to further improvements in quality and productivity
Liebherr-France SAS in Colmar has put a new assembly line into operation. It is based on the principles of lean management, and will thus contribute to further improvements in quality and productivity. Overall, the company has invested five million Euro in the XY-metre-long production line.
The main task of the new line is to produce the latest generation of Liebherr crawler excavators, which was launched on the market worldwide this year as the "Generation 8". The product line consists of the R 922, R 924, R 926, R 930, R 934, R 938 and R 945 models.
With logistical means that are optimally geared to production, the new assembly line achieves average cycle times of 155 minutes per station with an output of 5 excavators each day. Altogether, the "R3" assembly line has 26 work stations and 9 preassembly stations synchronised with the main line.
Liebherr-France SAS today
With a workforce of over 1500 employees and annual production of 2000 machines, Liebherr-France SAS in Colmar is the main production location for earthmoving crawler excavators in the Liebherr Group. The standard production range comprises around thirty crawler excavator models, from the R 914 Compact to the R 980 SME for earthmoving work and for use in mining.
Production also includes a large number of special machines for special work requirements, such as, for example, the deconstruction of buildings, material handling, maritime applications (pontoons) or tunnel construction applications, as well as electric excavators. The crawler excavators with an operating weight of 14 to 100 tonnes are equipped with Liebherr engines with power of 90 to 420 kW.
![](/storage/aziende/14852496638096.jpg)
Ultime notizie di Liebherr EM-Tec Italia
![100,000th machine: Liebherr sets milestone on its 75th anniversary](/storage/2024/07/100000th-machine-liebherr-sets-milestone-on-its-75th-anniversary-66a4882ac8547.jpg)
Earthmoving Machinery
29/07/2024
100,000th machine: Liebherr sets milestone on its 75th anniversary
It is another milestone in the historyLiebherr-Hydraulikbagg...
![First large Liebherr wheel loader with hydrogen engine and first hydrogen filling station in Salzburg](/storage/2024/07/first-large-liebherr-wheel-loader-with-hydrogen-engine-and-first-hydrogen-filling-station-in-salzburg-6688f59871f7a.jpg)
Earthmoving Machinery
17/07/2024
First large Liebherr wheel loader with hydrogen engine and first hydrogen filling station in Salzburg
World's first prototype large wheel loader with hydrogen eng...
![Liebherr's XPower wheel loaders are ideal for handling sand and gravel](/storage/2024/06/liebherrs-xpower-wheel-loaders-are-ideal-for-handling-sand-and-gravel-668115fe30a33.jpg)
Earthmoving Machinery
11/07/2024
Liebherr's XPower wheel loaders are ideal for handling sand and gravel
Liebherr's XPower wheel loaders and their smart machine conc...
![Kurt Motz expands its fleet with seven new Liebherr machines](/storage/2024/06/kurt-motz-expands-its-fleet-with-seven-new-liebherr-machines-66810e3e3d8b3.jpg)
Perforation
05/07/2024
Kurt Motz expands its fleet with seven new Liebherr machines
The company Kurt Motz expands its fleet with seven new Liebh...
![Eti Maden opts for Liebherr Crawler Dozers](/storage/2024/06/eti-maden-opts-for-liebherr-crawler-dozers-665defcac88a8.jpg)
Earthmoving Machinery
07/06/2024
Eti Maden opts for Liebherr Crawler Dozers
Industry leader Eti Maden confirms lower fuel consumption th...
![LRB 23 continues the success story of piling and drilling rigs for Liebherr](/storage/2024/05/lrb-23-continues-the-success-story-of-piling-and-drilling-rigs-for-liebherr-66485fc11a92e.jpg)
Perforation
03/06/2024
LRB 23 continues the success story of piling and drilling rigs for Liebherr
The piling and drilling rig type LRB 23 closes the gap betwe...
Altri International
![100,000th machine: Liebherr sets milestone on its 75th anniversary](/storage/2024/07/100000th-machine-liebherr-sets-milestone-on-its-75th-anniversary-66a4882ac8547.jpg)
International
29/07/2024
100,000th machine: Liebherr sets milestone on its 75th anniversary
It is another milestone in the historyLiebherr-Hydraulikbagg...
![KönningKrane takes delivery of Liebherr LTM 1160-5.2](/storage/2024/07/konningkrane-takes-delivery-of-liebherr-ltm-1160-52-669f9a5f379f9.jpg)
International
29/07/2024
KönningKrane takes delivery of Liebherr LTM 1160-5.2
KönningKrane GmbH & Co KG from Stadtlohn in the north-west o...
![Exclusive new Cat Track Wear Sensor](/storage/2024/07/exclusive-new-cat-track-wear-sensor-669f9e20ae70c.jpg)
International
26/07/2024
Exclusive new Cat Track Wear Sensor
Exclusive new Cat Track Wear Sensor provides remote, no-touc...
![Tamás és Zsolt Kft. took delivery of Liebherr LTM 1650-8.1](/storage/2024/07/tamas-es-zsolt-kft-took-delivery-of-liebherr-ltm-1650-81-6688f18bdc18d.jpg)
International
26/07/2024
Tamás és Zsolt Kft. took delivery of Liebherr LTM 1650-8.1
Tamás és Zsolt Kft. has added a Liebherr LTM 1650-8.1 to its...
![Cummins opens new powertrain test facility](/storage/2024/07/cummins-opens-new-powertrain-test-facility-669f9c6a4b904.jpg)
International
25/07/2024
Cummins opens new powertrain test facility
Cummins has opened a new powertrain test facility to support...
![Grove GMK6300L-1 proves perfect for compact jobsite in Rotterdam](/storage/2024/07/grove-gmk6300l-1-proves-perfect-for-compact-jobsite-in-rotterdam-6683b901e94d4.jpg)
International
25/07/2024
Grove GMK6300L-1 proves perfect for compact jobsite in Rotterdam
Kraanverhuur Boekestijn sent its Grove GMK6300L-1 for city c...