Home \ International \ Working range of the Liebherr 172 EC-B 8 Litronic flat-top crane increased
Working range of the Liebherr 172 EC-B 8 Litronic flat-top crane increased
01/02/2018
Pubblicato da Redazione
Working range of the Liebherr 172 EC-B 8 Litronic flat-top crane increased
Liebherr has reworked the successful 172 EC-B 8 Litronic flat-top crane and will present its successor to experts for the first time at Intermat 2018.
The jib has been extended to 62.5 metres and enables even more accurate division. The new flat-top crane will be presented on the new 16 EC tower system alongside the LiUP internal crane driver elevator.
The 172 EC-B 8 Litronic Flat-Top crane has been modified – its range has been increased by 2.5 metres and it can now be combined with the new Liebherr tower system. The Liebherr tower crane can now hoist 1800 kilograms at the jib head with a radius of 62.5 metres. Its maximum load capacity is still 8000 kg.
The finer division of the jib in 2.5-metre steps means that the crane can be adjusted even more precisely to site conditions and, if necessary, to the awkward edges of buildings.
New tower system
The crane can be supplied with the new 16 EC, 16 HC, 17 HC and 21 HC tower systems. The maximum free-standing hook height of the Flat-Top crane remains at 71.4 metres.
At the event in Paris, the 172 EC-B 8 Litronic will be on a 16 EC tower system. This compact system is a new addition to the Liebherr tower system product portfolio and available in two metre-tonne classes. The range comprises 16 EC 160 and 16 EC 240 towers, with the first figure being the external dimensions of 1.60 m x 1.60 m and the second figure specifying the metre-tonnes. The crane is also supported on a new 20 EC cruciform base with external dimensions of 4.50 metres.
LiUP crane driver elevator
There are already around 30 LiUPs in use in France alone, with more being ordered for delivery this year. That provides plenty of reason for Liebherr to exhibit the crane driver elevator once again at the Intermat. The LiUP is powered by a lithium-ion battery with an energy recovery system and is compatible with both the EC and the HC tower system.
The elevator can be installed on the inside of the tower. The rails for the Liebherr crane driver elevator are coordinated to the length of the Liebherr tower sections, only require one-time installation and, if they are installed on the inside of the tower, do not have to be removed for dismantling and assembling the tower crane. New tower systems can be ordered from the factory with or without rails.
Ultime notizie di Liebherr Italia
Lifting
19/11/2024
Liebherr Tower Cranes and John Paul Construction celebrate 50 years of partnership
Irish construction company John Paul Construction is celebra...
Lifting
29/10/2024
Wertz-Autokrane takes delivery of Liebherr LTM 1110-5.2 mobile crane
– The new 110-tonne crane complements the Wertz crane fleet...
Lifting
23/10/2024
New Liebherr mobile cranes for Scotland
To mark its 20th anniversary, Stoddart Crane Hire gave itsel...
Lifting
17/10/2024
German Federal Agency for Technical Relief places its trust in Liebherr compact cranes
The German Federal Agency for Technical Relief (THW) placed...
Lifting
14/10/2024
S.A.S Group expands Liebherr crane fleet
S.A.S Group expanded its Liebherr crane fleet with LTM 1300-...
Lifting
04/10/2024
Liebherr’s mobile construction crane range is expanding
MK 120-5.1, now available to order, is an agile five-axle mo...
Altri International
International
23/11/2024
GPMat International takes delivery of two Raimondi T147s residential development in the South of France
- Official agent of France expands its product lineup with t...
International
22/11/2024
Sarens acquires additional SCHEUERLE SPMT K24 modules
renowned for its expertise in crane rental services, heavy l...
International
22/11/2024
Five WOLFF cranes modernize Oslo’s Ulven district
With a total of five WOLFF cranes of type 7534.16 Clear, Wol...
International
21/11/2024
Kleemann: New compact crusher used for recycling
Impact crusher MOBIREX MR 100i NEO impresses during operatio...
International
21/11/2024
SITECH partners with Royal Engineers to create poppy and demonstrate tech offering
The demostration involved creating a ground-level poppy desi...
International
20/11/2024
Strong and stable RA30 trucks carry the weight at New Caledonian mine
Three Rokbak RA30 trucks are delivering exceptional durabili...